We pursue the administration tenet of "Quality is exceptional, Assistance is supreme, Reputation is first", and will sincerely create and share success with all clients for autoclave machine, Coal Fired Boilers, rice husk steam boiler, Create Values,Serving Customer!" would be the purpose we pursue. We sincerely hope that all clients will build long-lasting and mutually effective cooperation with us.In the event you wish to get extra facts about our enterprise, Be sure to get in touch with with us now.
Online Exporter Boiler Industry - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

Online Exporter Boiler Industry - Installation & Technology Service – Double Rings detail pictures

Online Exporter Boiler Industry - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

Sticking to your belief of "Creating solutions of high quality and generating buddies with people from all around the world", we always put the fascination of customers to start with for Online Exporter Boiler Industry - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Lithuania, Singapore, Nicaragua, We expect to provide products and services to more users in global aftermarket markets; we launched our global branding strategy by providing our excellent products all over the world by virtue of our well reputed partners letting global users keep pace with technology innovation and achievements with us.
  • The company's products very well, we have purchased and cooperated many times, fair price and assured quality, in short, this is a trustworthy company!
    5 Stars By Marina from Swedish - 2018.12.11 14:13
    On this website, product categories is clear and rich, I can find the product I want very quickly and easily, this is really very good!
    5 Stars By Yannick Vergoz from Borussia Dortmund - 2018.10.09 19:07
    Write your message here and send it to us

    Related products

    • OEM/ODM Supplier Oil Boiler - Coal Boiler Biomass Boiler Chimney – Double Rings

      OEM/ODM Supplier Oil Boiler - Coal Boiler Biom...

      Used in Boiler The height of a chimney affects its ability to deliver flue gas to the external environment through the chimney effect. In addition, the diffusion of pollutants using chimneys at high altitudes can reduce the impact on the surrounding environment. A chimney high enough to allow the chemicals in the air to partially or completely neutralize themselves before reaching the ground level, in the case of chemical erosion. Dispersion of pollutants over a larger area reduces their conc...

    • OEM Factory for Lpg Steam Boiler - Coke Boiler – Double Rings

      OEM Factory for Lpg Steam Boiler - Coke Boiler...

      Instruction DZH Coking coal Boiler adopts high efficient heat transfer components – threaded pipe, with a reasonable flue flow rate, boiler efficiency is higher than the national professional standards 6~8%; the convex tube plate and threaded pipe make the boiler drum from quasi-rigid body to quasi-elastic body, which be with airfoil style flue completely avoid the drawbacks of traditional fire tube boiler high temperature tube plate cracking. The boiler dust inertia separation combined...

    • New Fashion Design for Commercial Biomass Boilers - Gas/Oil Fired Hot Water Boiler – Double Rings

      New Fashion Design for Commercial Biomass Boile...

      Introduction : WNS series steam boiler burning oil or gas is Horizontal internal combustion three backhaul fire tube boiler, adopts boiler furnace wet back structure, high temperature smoke, gas turn to scour the second and third backhaul smoke tube plate, then after the smoke chamber. discharged into the atmosphere through the chimney. There are the front and back Smokebox Cap in the boiler, easy to maintenance. Excellent burner adopts combustion automatic ratio adjustment , feedwater ...

    • Excellent quality Industrial Boiler Ltd - Boiler Installation Material – Double Rings

      Excellent quality Industrial Boiler Ltd - Boil...

      Used in Boiler DZL 6-1.25-AII STEAM BOILER Installation Material List   Flange Stop Valve   Item  Description   Quantity 1 DN 150    1.6 MPA 1 PC 2 DN 100    1.6 MPA 1 PC 3 DN 80     1.6 MPA 1 PC 4 DN 65     1.6 MPA 2 PCS 5 DN 50     1.6 MPA 3 PCS 6 DN 40     1.6 MPA 1 PC 7 DN 15     1.6 MPA 1 PC   Flange Check Valve   Item  Description   Quantity 1 DN 50     1.6 MPA 1 PC   Flange   Item  Description   Quantity 1 DN 150      2 PCS 2 DN 100       3...

    • Good Quality Boiler - Boiler Sample Cooling Collection – Double Rings

      Good Quality Boiler - Boiler Sample Cooling Co...

      Used in Boiler Sampling Cooler  This entry was reviewed by the “Popular Science China” science encyclopedia entry compilation and application project. An instrument used for sampling and cooling of soda-water samples in a boiler room or power plant. The sampling cooler comprises a cooling water tank, an inlet pipe, a flange cover, a outlet pipe, a busbar and a plurality of cooling coils; It can effectively improve the accuracy of water quality analysis, and at the same time ...

    • Leading Manufacturer for Bosch Boiler - Vertical Gas Oil Boiler – Double Rings

      Leading Manufacturer for Bosch Boiler - Vertic...

      Introduction : 1. Compact structure, small installation area, easy to install. 2. Good heating surface , low exhaust gas temperature 3. The world famous original burner, automatic and high efficient combustion, high combustion efficiency 4. Microcomputer automatic controller, overpressure protection and ultra-low water level automatic protection and automatic feed water . 5. Super thickness insulating layer design, good insulation effect, boiler surface temperature low, low losing he...