New Arrival China Hot Water Boiler - Steam&Hot Water Pipe – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

Our personnel are always inside the spirit of "continuous improvement and excellence", and together with the outstanding excellent goods, favorable price and good after-sales services, we try to gain every customer's trust for oil fired combi boiler, Chinese boiler chimney, Biomass Boiler Cost, Our merchandise are widely recognized and trusted by users and can meet up with continuously changing economic and social needs.
New Arrival China Hot Water Boiler - Steam&Hot Water Pipe – Double Rings Detail:

Products Description

Structure Steel pipe– insulation layer–steel jacket pipe
Steel pipe process 1. Seamless,
2. Spiral steel pipe( SAW)
3. Straight steel pipe(ERW)
Insulation layer of external sliding type Fiberglass wool or rock wool
Insulation layer of internal sliding type 1. Calcium silicate insulation material
2. Polyurethane insulation material
Application 1. Steam
2. Hot oil
3. Hot material
Specification DN57-1020mm(1 inch-64 inch)
Medium temperature 150-350℃
Medium pressure Less than 2.5MPa
Advantages

 

1. The heat-insulating material has the advantages of light, durability, excellent heat preservation performance, low heat
consumption and maximum utilization of heat energy.
2. Vacuum extraction technology can be used to effectively prevent the corrosion of internal and external steel pipes.
3. Special material heat insulation is adopted between the sliding bracket and the steel pipe to effectively solve the heat bridge
problem in the pipe network, and the heat loss of the pipeline is reduced
Related products 1. Joint materials(steel sleeve, insulation material)
2. Fittings(tee, elbow, reducer,adapter)

 


Product detail pictures:

New Arrival China Hot Water Boiler - Steam&Hot Water Pipe – Double Rings detail pictures

New Arrival China Hot Water Boiler - Steam&Hot Water Pipe – Double Rings detail pictures


Related Product Guide:
Boiler Structure

With a complete scientific quality management system, good quality and good faith, we win good reputation and occupied this field for New Arrival China Hot Water Boiler - Steam&Hot Water Pipe – Double Rings , The product will supply to all over the world, such as: Ghana, Croatia, Victoria, We critically promise that we deliver all the customers with the best quality solutions, the most competitive prices and the most prompt delivery. We hope to win a resplendent future for customers and ourselves.
  • This is a very professional wholesaler, we always come to their company for procurement, good quality and cheap.
    5 Stars By Elizabeth from Panama - 2018.06.18 17:25
    This is a very professional and honest Chinese supplier, from now on we fell in love with the Chinese manufacturing.
    5 Stars By Abigail from Norway - 2018.11.11 19:52
    Write your message here and send it to us

    Related products

    • Leading Manufacturer for Bosch Boiler - Boiler Valve and Meter – Double Rings

      Leading Manufacturer for Bosch Boiler - Boiler...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

    • Short Lead Time for Water Tube Boilers - Installation & Technology Service – Double Rings

      Short Lead Time for Water Tube Boilers - Insta...

      Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...

    • Hot-selling Industrial Electric Boiler - Boiler Valve and Meter – Double Rings

      Hot-selling Industrial Electric Boiler - Boile...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

    • China OEM Natural Gas Hot Water Boiler - heat recovery boiler – Double Rings

      China OEM Natural Gas Hot Water Boiler - heat ...

      Introduction: Main Performance Parameter List Steam Pressure 1.0~2.5 Mpa Inlet Temperature 250℃ Saturation Temperature 179℃ Heating Water:Inlet Temperature 90℃; Outlet Temperature 140℃

    • Professional China Water Tube Boiler - Boiler Water Pump – Double Rings

      Professional China Water Tube Boiler - Boiler ...

      Water Pump used in Boiler Components in contact with water—made of  SS304 or SS316 Head:  4~305m Flow rate:0.4~240m^3/h Phase: single phase or three phase Power: 220V/380V Connection: flange or threaded

    • Hot Sale for Biomass Steam Boiler - Boiler Water Pump – Double Rings

      Hot Sale for Biomass Steam Boiler - Boiler Wat...

      Water Pump used in Boiler Components in contact with water—made of  SS304 or SS316 Head:  4~305m Flow rate:0.4~240m^3/h Phase: single phase or three phase Power: 220V/380V Connection: flange or threaded