Short Lead Time for Water Tube Boilers - Installation & Technology Service – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

We believe that prolonged expression partnership is really a result of top of the range, value added support, rich encounter and personal contact for electric central heating boiler, Electric Water Boilers, Biomass Boiler Cost, We are confident to make great achievements in the future. We are looking forward to becoming one of your most reliable suppliers.
Short Lead Time for Water Tube Boilers - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

Short Lead Time for Water Tube Boilers - Installation & Technology Service – Double Rings detail pictures

Short Lead Time for Water Tube Boilers - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

We retain improving upon and perfecting our items and repair. At the same time, we perform actively to do research and progress for Short Lead Time for Water Tube Boilers - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Porto, Roman, Nepal, With a wide range, good quality, reasonable prices and stylish designs, our products are extensively used in this field and other industries. We welcome new and old customers from all walks of life to contact us for future business relationships and achieving mutual success! We welcome customers, business associations and friends from all parts of the world to contact us and seek cooperation for mutual benefits.
  • We are a small company that has just started, but we get the company leader's attention and gave us a lot of help. Hope we can make progress together!
    5 Stars By Jocelyn from Monaco - 2017.06.22 12:49
    We are really happy to find such a manufacturer that ensuring product quality at the same time the price is very cheap.
    5 Stars By Ivan from Switzerland - 2018.09.21 11:01
    Write your message here and send it to us

    Related products

    • China Manufacturer for Electric Steam Generator - Vertical Wood /Coal Boiler – Double Rings

      China Manufacturer for Electric Steam Generator...

      Introduction : Vertical type boiler, adopt water&fire tube structure, suitable for coal/wood/solid material fire. Vertical boiler, thermal capacity in 100kw/200kw/300kw/350kw/500kw/600kw/700kw/1000kw per hour. Feature: * Compact, small footprint, easy installation. * Fully furnished heating surface, flue gas temperature is low. * Using the world famous original burner, implement automatic and efficient combustion, the combustion efficiency. * Microcomputer automatic control,...

    • China Factory for Boiler Operating - Boiler Sample Cooling Collection – Double Rings

      China Factory for Boiler Operating - Boiler Sa...

      Used in Boiler Sampling Cooler  This entry was reviewed by the “Popular Science China” science encyclopedia entry compilation and application project. An instrument used for sampling and cooling of soda-water samples in a boiler room or power plant. The sampling cooler comprises a cooling water tank, an inlet pipe, a flange cover, a outlet pipe, a busbar and a plurality of cooling coils; It can effectively improve the accuracy of water quality analysis, and at the same time ...

    • Top Quality Oil Central Heating - Coke Boiler – Double Rings

      Top Quality Oil Central Heating - Coke Boiler ...

      Instruction DZH Coking coal Boiler adopts high efficient heat transfer components – threaded pipe, with a reasonable flue flow rate, boiler efficiency is higher than the national professional standards 6~8%; the convex tube plate and threaded pipe make the boiler drum from quasi-rigid body to quasi-elastic body, which be with airfoil style flue completely avoid the drawbacks of traditional fire tube boiler high temperature tube plate cracking. The boiler dust inertia separation combined...

    • 2020 High quality Outdoor Coal Boiler - Biomass Hot Water Boiler – Double Rings

      2020 High quality Outdoor Coal Boiler - Biomas...

      Introduction : Biomass boiler is horizontal three-back water fire pipe composite boiler. The fuel can be Biomass,coal,wood,rice husk,shells,pellets,bagasse,waste etc.. Display Feature: 1. High thermal efficiency 2. By mechanize operation, reduce intensity of labour of stoker. 3. Easy for installation, when on site, only install slag remover, valve, pipe, water and power, etc., the boiler can be launched into running, additionally, the firing is fast. 4. Easy for installation and moving, save...

    • China Factory for Commercial Biomass Boilers - Gas Oil Thermal Oil Boiler – Double Rings

      China Factory for Commercial Biomass Boilers -...

      Introduction The gas-fired Thermol Oil Boiler uses a closed cycle for heat supply and liquid phase transport of heat energy, which has the characteristics of less heat loss, and effectively prolongs the life of the boiler, energy saving and environmental protection. The inside of the furnace adopts a three-circuit tube design and a direct flow structure to ensure the safety of the boiler and effectively extend the service life of the boiler. The coil structure increases the heating surf...

    • New Fashion Design for Commercial Biomass Boilers - Coal Boiler Chain Grate – Double Rings

      New Fashion Design for Commercial Biomass Boile...

      More phtos The patent material  RTSiCr,RQTSi4Mo which is our company’s unique material. High temperature resistance, Special process, longer service life.   Travelling type grate stoker Spare Parts—Grate Bar The structure is simple, the metal consumption is small, the ventilation section ratio is large, and the strength and performance requirements of the driving shaft, the driven shaft and the grate are high.