Used in Boiler

DZL 6-1.25-AII STEAM BOILER Installation Material List

  Flange Stop Valve

  Item  Description   Quantity
1 DN 150    1.6 MPA 1 PC
2 DN 100    1.6 MPA 1 PC
3 DN 80     1.6 MPA 1 PC
4 DN 65     1.6 MPA 2 PCS
5 DN 50     1.6 MPA 3 PCS
6 DN 40     1.6 MPA 1 PC
7 DN 15     1.6 MPA 1 PC

  Flange Check Valve

  Item  Description   Quantity
1 DN 50     1.6 MPA 1 PC

  Flange

  Item  Description   Quantity
1 DN 150      2 PCS
2 DN 100       30 PCS
3 DN 80      1 PC
4 DN 65       2 PCS
5 DN 50       20 PCS
6 DN 40       8 PCS
7 DN 15       1 PC

  Screw Ball Valve

  Item  Description   Quantity
1 DN 40     1.6 MPA 3 PCS
2 DN 15     1.6 MPA 3 PCS
3 DN 20     1.6 MPA 2 PCS

  Movable Joint (Use in Water Pump)

  Item  Description   Quantity
1 DN 40     2 PCS
2 DN 20       1 PC

 Six-Wing Screw (Double-Head)(Use in Water Pump)

  Item  Description   Quantity
1 DN 40      6 PCS
2 DN 20       4 PCS
3 DN 15 2 PCS

  Pressure Gauge

  Item  Description   Quantity
1 Φ 150  0~1.6Mpa 1 PC
2 Φ 150  0~2.5Mpa 1 PC
3  Pressure Gauge Elbow Pipe 2 PCS
4  Three Way Cock   2 pcs

 Graphite Steel Cushion

  Item  Description   Quantity
1 DN 150   6 PCS
2 DN 100     6 PCS
3 DN 80 10 PCS
4 DN 65       6 PCS
5 DN 50       4 PCS
6 DN 40       10 PCS
7 DN 25       20 PCS
8 DN 20       4 PCS
9 DN 15       4 PCS

  Bolt

  Item  Description  Quantity
1 M 20X65 50 Sets
2 M 18X65 50 Sets
3 M 16X60 240 Sets
4 M 16X50 100 Sets
5 M 12X50 100 Sets
6 M 12X40 200 Sets
7 M 10X40 200 Sets
8 M 20X400 (Stone Bolt use for Chimney) 10 Sets

  Seamless Steal Tube

  Item  Description   Quantity
1  Φ 159 12 meter
2  Φ 108 12 meter
3  Φ 57  30 meter
4  Φ 45 6 meter
5  Φ 76 12 meter
6  Φ 22 12 meter

  Elbow  

  Item  Description  Quantity
1  Φ 159 3 PCS
2  Φ 100 3 PCS
3  Φ 76  2 PCS
4  Φ 57 15 PCS
5  Φ 45 4 PCS
6  Φ 22 2 PCS

 Screw Elbow Use in Pipe of Water Pump

  Item  Description  Quantity
1 DN 40   4 PCS
2 DN 20     2 PCS

 Screw Three-way Use in Pipe of Water Pump

  Item  Description  Quantity
1 DN 40   2 PCS

 Asbestos Rope

 Item  Description  Quantity
1  Asbestos  rope 10 Kg

 


Product detail pictures:

Factory wholesale Oil Condensing Boilers - Boiler Installation Material – Double Rings detail pictures

Factory wholesale Oil Condensing Boilers - Boiler Installation Material – Double Rings detail pictures

Factory wholesale Oil Condensing Boilers - Boiler Installation Material – Double Rings detail pictures

Factory wholesale Oil Condensing Boilers - Boiler Installation Material – Double Rings detail pictures


Related Product Guide:
Boiler Structure

We constantly think and practice corresponding to the change of circumstance, and grow up. We aim at the achievement of a richer mind and body along with the living for Factory wholesale Oil Condensing Boilers - Boiler Installation Material – Double Rings , The product will supply to all over the world, such as: South Africa, Argentina, Greece, What is good price? We provide customers with factory price. In the premise of good quality, efficiency will have to be paid attention to and maintain appropriate low and healthy profits. What is a fast delivery? We make the delivery according to customers' requirements. Although delivery time depends on the order quantity and the complexity of it, we still try to supply products and solutions in time. Sincerely hope we could have long term business relationship.
  • The company has a good reputation in this industry, and finally it tured out that choose them is a good choice.
    5 Stars By Barbara from Bogota - 2018.06.26 19:27
    This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
    5 Stars By Dominic from Istanbul - 2017.06.22 12:49
    Write your message here and send it to us

    Related products

    • Short Lead Time for Water Tube Boilers - Installation & Technology Service – Double Rings

      Short Lead Time for Water Tube Boilers - Insta...

      Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...

    • Popular Design for Boiler Accessory - Well-designed Biomass Pellet Boiler - Coal Boiler Biomass Boiler Reducer – Double Rings – Double Rings

      Popular Design for Boiler Accessory - Well-des...

      Reducer used in DR Boiler • The main parts adopt high quality carbon structural refined steel.With high strength, high transmission efficiency and reliable operation, long service life, etc. • Respectively using multilevel, stepless frequency conversion speed regulating mode. User can reasonably match speed reducer according to the different operation condition of boiler.With the features of easy operation, energy saving, etc • With characteristics of large transmission torque and speed...

    • Low price for Industrial Boilers Manufacturers - Coal Boiler Biomass Boiler Multi-Tube Dust Cleaner – Double Rings

      Low price for Industrial Boilers Manufacturers ...

      Used in Boiler Multi-tube dust collector belongs to cyclone type dry dust collector, mainly used for boiler and industrial dust collection. Multi-tube dust collector, a kind of cyclone dust collector. Many small cyclone dust collectors (also called cyclones) are combined in a shell and used in parallel. The diameter of the cyclone varies from 100 to 250 mm and can effectively trap 5 to 10 μm dust. It is cast with wear-resistant cast iron and can handle gas with high dust concentration (...

    • OEM Factory for Lpg Steam Boiler - Installation & Technology Service – Double Rings

      OEM Factory for Lpg Steam Boiler - Installatio...

      Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...

    • Professional China Water Tube Boiler - Single Drum Steam Boiler – Double Rings

      Professional China Water Tube Boiler - Single ...

      Introduction : Single Drum Chain Grate Coal fired boiler is horizontal three-back water fire pipe composite boiler. Fix fire tube in drum and the light pipe water wall is fixed on the right and left sides of the furnace. With light chain grate stoker for mechanical feeding and by the draft fan and blower for mechanical ventilation, realize mechanical taphole by scraper slag remover. The hopper of fuel drops to grate bar, then enter furnace for burning, by the ashes room above the back arch, t...

    • Competitive Price for Pressure For Boiler - Coal Boiler Economizer – Double Rings

      Competitive Price for Pressure For Boiler - Co...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer P...