Wholesale Steam Tube Boiler - Coal Boiler Biomass Boiler Chimney – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

Our primary goal is to offer our clients a serious and responsible business relationship, providing personalized attention to all of them for rice husk steam boiler, natural gas steam boiler, economizer, We sincerely welcome friends to negotiate business and start cooperation. We hope to join hands with friends in different industries to create a brilliant future.
Wholesale Steam Tube Boiler - Coal Boiler Biomass Boiler Chimney – Double Rings Detail:

Used in Boiler

The height of a chimney affects its ability to deliver flue gas to the external environment through the chimney effect.
In addition, the diffusion of pollutants using chimneys at high altitudes can reduce the impact on the surrounding environment.
A chimney high enough to allow the chemicals in the air to partially or completely neutralize themselves before reaching the ground level, in the case of chemical erosion.
Dispersion of pollutants over a larger area reduces their concentration and promotes compliance with regulatory restrictions.

chimney


Product detail pictures:


Related Product Guide:
Boiler Structure

We support our consumers with ideal good quality merchandise and large level provider. Becoming the specialist manufacturer in this sector, we have attained wealthy practical encounter in producing and managing for Wholesale Steam Tube Boiler - Coal Boiler Biomass Boiler Chimney – Double Rings , The product will supply to all over the world, such as: Doha, Belgium, Algeria, So We also continuously function. we, focuse on high quality, and are conscious of the importance of environmental protection, most of the merchandise are pollution-free, environmentally friendly products, reuse on the solution. We've Updated our catalog, which introduces our organization. n detail and covers the primary items we provide at present, You may also visit our web-site, which involves our most recent product line. We look forward to reactivating our company connection.
This supplier stick to the principle of "Quality first, Honesty as base", it is absolutely to be trust.
5 Stars By Colin Hazel from Israel - 2017.03.28 16:34
The sales manager is very patient, we communicated about three days before we decided to cooperate, finally, we are very satisfied with this cooperation!
5 Stars By Matthew from Somalia - 2017.03.28 16:34
Write your message here and send it to us

Related products

  • Excellent quality Industrial Boiler Ltd - Coal Boiler Biomass Boiler Water Flim Dust Cleaner – Double Rings

    Excellent quality Industrial Boiler Ltd - Coal...

    Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

  • Reasonable price for Oil Fired Boilers - SZS Gas Oil PLG Boiler – Double Rings

    Reasonable price for Oil Fired Boilers - SZS G...

    Introduction : SZS series boiler body is longitudinal 2-drum, D-type chamber combustion strueture. The furnace is on right side and the convection bank tube is on left side. The body is fixed on the body chassis by flexible supports in the middle and two ends of the lower drum,can secure to let the whole boiler body to expand sideways. Surround furnace there are narrow space membrane cooling tube wall. It is totally sealed and separated between the membrane wall on furnace left side and the c...

  • China Cheap price Biomass Boiler - Pellets Shells Husk Biomass Boiler – Double Rings

    China Cheap price Biomass Boiler - Pellets She...

    Parameter : DZG(L)Horizontal Type Biomass-Burning Steam Boiler Main Technology Parameter List Model DZG2-1.0-S DZL2-1.25-S DZL2-1.57-S DZL2-2.45-S   DZG4-1.25-S DZL4-1.25-S DZL4-1.57-S DZL4-2.45-S DZL6-1.25-S DZL6-1.57-S DZL6-2.45-S  DZL8-1.25-S DZL8-1.57-S DZL8-2.45-S DZL10-1.25-S DZL10-1.57-S DZL10-2.45-S Rated Capacity T/h 2 4 6 8 10 Rated Working Pressure Mpa 1.0/1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 Rated Steam Temp. ℃ 183/194/204/226 194/2...

  • China Gas Boiler Hot Water - Double Drum Hot Water Boiler – Double Rings

    China Gas Boiler Hot Water - Double Drum Hot W...

    Parameter : SZL Bearing Pressure Hot water Boiler Main Technology Parameter List ModelItem SZL2.8-1.0/115/70-AIISZL2.8-1.25/130/70-AII SZL4.2-1.0/115/70-AIISZL4.2-1.25/130/70-AII SZL5.6-1.0/115/70-AIISZL5.6-1.25/130/70-AII Rated Capacity   2.8T/h 4.2 T/h 5.6 T/h Rated Working Pressure Mpa 1.0/1.25 1.0/1.25 1.0/1.25 Rated Steam Temp. ℃ 115/130 115/130 115/130 Feed Water Temp. ℃ 70 70 70 Fuel Consumption  Kg/H ~580 ~900 ~1130 Thermal Efficiency  % 78 80 80 Heating Surface Boil...

  • China Oil Gas Steam Boiler - Vertical Wood /Coal Boiler – Double Rings

    China Oil Gas Steam Boiler - Vertical Wood /Co...

    Introduction : Vertical type boiler, adopt water&fire tube structure, suitable for coal/wood/solid material fire. Vertical boiler, thermal capacity in 100kw/200kw/300kw/350kw/500kw/600kw/700kw/1000kw per hour. Feature: * Compact, small footprint, easy installation. * Fully furnished heating surface, flue gas temperature is low. * Using the world famous original burner, implement automatic and efficient combustion, the combustion efficiency. * Microcomputer automatic control,...

  • Massive Selection for Biomass Boiler Cost - Installation & Technology Service – Double Rings

    Massive Selection for Biomass Boiler Cost - In...

    Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...