Wholesale Industry Boiler - Vertical Gas Oil Boiler – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

We've our have sales staff, style and design staff, technical crew, QC team and package workforce. We've strict excellent control procedures for each system. Also, all of our workers are experienced in printing field for chinese coke boiler, Water Tube Boilers, Steam Generator Boiler, Honesty is our principle, skilled procedure is our perform, service is our target, and customers' satisfaction is our long term!
Wholesale Industry Boiler - Vertical Gas Oil Boiler – Double Rings Detail:

Introduction :

1. Compact structure, small installation area, easy to install.
2. Good heating surface , low exhaust gas temperature
3. The world famous original burner, automatic and high efficient combustion, high combustion efficiency
4. Microcomputer automatic controller, overpressure protection and ultra-low water level automatic protection and automatic feed water .
5. Super thickness insulating layer design, good insulation effect, boiler surface temperature low, low losing heating.
6. Small dust emission to achieve the requirements of the national environmental safety.

Steam Boiler Parameter

LHS Vertical Steam Boiler burning oil or gas

Main Technology Parameter List

ModelItem LHS0.1-0.4-YQLHS0.1-0.7-YQ   LHS0.2-0.4-YQLHS0.2-0.7-YQ LHS0.3-0.4-YQLHS0.3-0.7-YQ LHS0.5-0.4-YQLHS0.5-0.7-YQ LHS0.7-0.4-YQLHS0.7-0.7-YQ LHS1-0.4-YQLHS1-0.7-YQLHS1-1.0-YQ
Rated Capacity  T/h

0.1  

0.2  

0.3  

0.5 

0.7 

1.0  

Rated Working Pressure

0.4/0.7 Mpa

0.4/0.7 Mpa

0.4/0.7 Mpa

0.4/0.7 Mpa

0.4/0.7 Mpa

0.4/0.7 Mpa

Rated Steam Temp.

152/170

151.8/170

151.8/170

151.8/170

151.8/170

151.8/170/183

Feed Water Temp.

20

Heating Surface

2.3

4.34

6.53

12.05

20.93

25.48

Installed Overall Dimension 

1.26×1.25×1.97

1.456×1.35×2.07

1.91×1.68×2.475

2.15×1.9×2.735

1.54×2.3×2.855

2.963×2.35×3.07

Boiler Weight  Ton

1

1.15

1.67

2.57

2.96

4.03

Water Pump Model

JGGC  0.6-8

JGGC  0.6-8

JGGC  0.6-8

JGGC  0.6-12

JGGC  0.6-12

JGGC  2-10

Chimney mm

Ø 150

Ø 150

Ø 200

Ø 200

Ø 300

Ø 300

Thermal Efficiency  %

83

83

83

83

83

83

Design Fuel

Light Oil/Town Gas/Natural Gas

Burner Brand`

Italy RIELLO Burner G20S

Ringelmann shade 

< Grade 1

Hot Water Boiler Parameter

Atmospheric Pressure Hot Water Boiler burning gas or oil

Main Parameter List

Model

Item

CLHS0.21-95/

70-Y(Q)

 

CLHS0.35-95/

70-Y(Q)

 

CLHS0.5-95/

70-Y(Q)

 

CLHS0.7-95/

70-Y(Q)

 

CLHS1.05-95/

70-Y(Q)

 

CLHS1.4-95/

70-Y(Q)

 

Rated Thermal Power MW

0.21

0.35

0.5

0.7

1.05

1.4

Rated Outlet Water Temp. 

95

Rated Return Water Temp. 

20

Design Fuel

Heavy oil/0# Light Diesel oil/ Natural Gas

Heating Surface    

10.5

12.6

15

16.5

22

35.6

Design Thermal efficiency

83%

Heating Area    

1800

3000

4300

6000

9000

12000

Boiler Body Specification mm

Ø1164×2040

Ø1164×2550

Ø1264×2550

Ø1364×2360

Ø1468×2590

Ø1568×2830

Boiler Weight  Ton

1.7

1.9

2.5

3.0

3.1

3.8

Dust emission

<  100 mg/Nm3

Ringelmann shade

< Grade 1


Product detail pictures:

Wholesale Industry Boiler - Vertical Gas Oil Boiler – Double Rings detail pictures


Related Product Guide:
Boiler Structure

We also present product or service sourcing and flight consolidation products and services. We have our possess manufacturing facility and sourcing place of work. We can easily supply you with almost every type of product or service connected to our item variety for Wholesale Industry Boiler - Vertical Gas Oil Boiler – Double Rings , The product will supply to all over the world, such as: Argentina, Switzerland, San Francisco, Looking forward, we will keep pace with the times, continuing to create new products. With our strong research team, advanced production facilities, scientific management and top services, we will supply high quality products to our customers worldwide. We sincerely invite you to be our business partners for mutual benefits.
  • In general, we are satisfied with all aspects, cheap, high-quality, fast delivery and good procuct style, we will have follow-up cooperation!
    5 Stars By Victor Yanushkevich from Bolivia - 2018.12.14 15:26
    Hope that the company could stick to the enterprise spirit of "Quality, Efficiency, Innovation and Integrity", it will be better and better in the future.
    5 Stars By Alexander from Azerbaijan - 2017.05.02 18:28
    Write your message here and send it to us

    Related products

    • Factory selling Hot Water Tube - Boiler Sample Cooling Collection – Double Rings

      Factory selling Hot Water Tube - Boiler Sample...

      Used in Boiler Sampling Cooler  This entry was reviewed by the “Popular Science China” science encyclopedia entry compilation and application project. An instrument used for sampling and cooling of soda-water samples in a boiler room or power plant. The sampling cooler comprises a cooling water tank, an inlet pipe, a flange cover, a outlet pipe, a busbar and a plurality of cooling coils; It can effectively improve the accuracy of water quality analysis, and at the same time ...

    • Best Price on Industrial Biomass Boiler - Single Drum Steam Boiler – Double Rings

      Best Price on Industrial Biomass Boiler - Sing...

      Introduction : Single Drum Chain Grate Coal fired boiler is horizontal three-back water fire pipe composite boiler. Fix fire tube in drum and the light pipe water wall is fixed on the right and left sides of the furnace. With light chain grate stoker for mechanical feeding and by the draft fan and blower for mechanical ventilation, realize mechanical taphole by scraper slag remover. The hopper of fuel drops to grate bar, then enter furnace for burning, by the ashes room above the back arch, t...

    • Good Wholesale Vendors Biomass Heating - SHF Coal Water Slury Steam Boiler – Double Rings

      Good Wholesale Vendors Biomass Heating - SHF C...

      Introduction: As a new type of mature high-performance with low-pollution clean coal technology. circulating fluidized bed combustion(CFBC)technology is unlike others that it has a lot of unique characteristics. 1. Circulating fluidized bed is of low-temperature combustion, therefore nitrogen oxides emissions of such boiler is much lower than that of coal-powder boiler, and such boiler could directly desulfurize during combustion process. Circulating fluidized bed boiler with high desulfuriza...

    • factory customized Biomass Steam Boiler - Steam&Hot Water Pipe – Double Rings

      factory customized Biomass Steam Boiler - Stea...

      Products Description Structure Steel pipe– insulation layer–steel jacket pipe Steel pipe process 1. Seamless, 2. Spiral steel pipe( SAW) 3. Straight steel pipe(ERW) Insulation layer of external sliding type Fiberglass wool or rock wool Insulation layer of internal sliding type 1. Calcium silicate insulation material 2. Polyurethane insulation material Application 1. Steam 2. Hot oil 3. Hot material Specification DN57-1020mm(1 inch-64 inch) Medium temperature...

    • Special Price for Hot Oil Boiler - Single Drum Steam Boiler – Double Rings

      Special Price for Hot Oil Boiler - Single Drum...

      Introduction : Single Drum Chain Grate Coal fired boiler is horizontal three-back water fire pipe composite boiler. Fix fire tube in drum and the light pipe water wall is fixed on the right and left sides of the furnace. With light chain grate stoker for mechanical feeding and by the draft fan and blower for mechanical ventilation, realize mechanical taphole by scraper slag remover. The hopper of fuel drops to grate bar, then enter furnace for burning, by the ashes room above the back arch, t...

    • New Arrival China Hot Water Boiler - Installation & Technology Service – Double Rings

      New Arrival China Hot Water Boiler - Installat...

      Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...