Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

Well-designed Biomass Pellet Boiler - Installation & Technology Service – Double Rings detail pictures

Well-designed Biomass Pellet Boiler - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

We'll make every effort and hard work being outstanding and excellent, and speed up our techniques for standing during the rank of global top-grade and high-tech enterprises for Well-designed Biomass Pellet Boiler - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Casablanca, Morocco, Costa rica, We set "be a creditable practitioner to achieve the continuous development and innovation" as our motto. We would like to share our experience with friends at home and abroad, as a way to create a bigger cake with our joint efforts. We have several experienced R & D persons and we welcome OEM orders.
  • Although we are a small company, we are also respected. Reliable quality, sincere service and good credit, we are honored to be able to work with you!
    5 Stars By Michaelia from Philippines - 2017.05.21 12:31
    Problems can be quickly and effectively resolved, it is worth to be trust and working together.
    5 Stars By Mandy from Mexico - 2017.04.18 16:45
    Write your message here and send it to us

    Related products

    • Reliable Supplier Boiler Operating - Single Drum Hot Water Boiler – Double Rings

      Reliable Supplier Boiler Operating - Single Dr...

      Parameter : DZG(L)Bearing Pressure Hot water boiler Main Technology Parameter List Model DZG0.7-0.7/95/70 DZL0.7-0.7/95/70  DZG1.4-0.7/95/70 DZL1.4-0.7/95/70 DZL1.4-1.0/115/70 DZL28-1.0/115/70 DZL2.8-1.25/130/70 DZL4.2-1.0/115/70 DZL4.2-1.25/130/70 Rated Capacity T/h 0.7 1.4 2.8 4.2 Rated Working Pressure Mpa 0.7 0.7/1.0 1.0/1.25 1.0/1.25 Rated Steam Temp. ℃ 95 95/115 115/130 115/130 Feed Water Temp. ℃ 70 70 70 70 Fuel Consumption  Kg/H ~150 ~310 ~590 ~900 Thermal Efficiency ...

    • Top Quality Wood Chip Boiler - Boiler Steam Distribution Cylinder – Double Rings

      Top Quality Wood Chip Boiler - Boiler Steam Di...

      Used in Boiler Introduction The sub-cylinder is the main supporting equipment of the boiler. It is used to distribute the steam generated during the operation of the boiler to various pipelines. The sub-cylinder is a pressure-bearing equipment and belongs to a pressure vessel. Its pressure-bearing capacity and capacity should correspond to the supporting boiler . Main pressure components The main pressure components of the sub-cylinder are: head, shell material, etc. Usage The sub-cylin...

    • Leading Manufacturer for Bosch Boiler - Double Drum Hot Water Boiler – Double Rings

      Leading Manufacturer for Bosch Boiler - Double...

      Parameter : SZL Bearing Pressure Hot water Boiler Main Technology Parameter List ModelItem SZL2.8-1.0/115/70-AIISZL2.8-1.25/130/70-AII SZL4.2-1.0/115/70-AIISZL4.2-1.25/130/70-AII SZL5.6-1.0/115/70-AIISZL5.6-1.25/130/70-AII Rated Capacity   2.8T/h 4.2 T/h 5.6 T/h Rated Working Pressure Mpa 1.0/1.25 1.0/1.25 1.0/1.25 Rated Steam Temp. ℃ 115/130 115/130 115/130 Feed Water Temp. ℃ 70 70 70 Fuel Consumption  Kg/H ~580 ~900 ~1130 Thermal Efficiency  % 78 80 80 Heating Surface Boil...

    • Wholesale Industry Boiler - Pressure Vessel – Double Rings

      Wholesale Industry Boiler - Pressure Vessel &#...

      Introduction: Pressure vessel equipment plays an important role in the petrochemical industry, the energy industry, scientific research and military sectors etc. Pressure vessel container body consist of cylinder, sealing head, flange, sealing elements, open pore and connected pipe, bearing. In addition, also equipped with safety devices, meter and safety internals for protection purpose . Pressure Vessel Main Performance Parameter List Steam Pressure1.0Mpa Inlet Temperature 250℃ S...

    • Best quality Industrial Biomass Boiler - Gas oil Boiler Economizer – Double Rings

      Best quality Industrial Biomass Boiler - Gas o...

      More photo Boiler economizers are heat exchange devices with finned tubes that heat a liquid, sometimes water, up to however sometimes doesn’t exceed the boiling purpose of liquid. We can manufacture three types of boiler economizer, bare tube economizer, H finned tube economizer and spiral finned tube economizer. H-finned tube economizer is high efficient heat exchanger economizer which is consisted of H-finned tubes.

    • 2019 China New Design Steam Boiler Price - Autoclave and Boiler – Double Rings

      2019 China New Design Steam Boiler Price - Aut...

      Autoclave-Popular used in ACC Plant,Flyash Plant,Building Material etc.. Autoclave Feature 1, the first domestic production of autoclave professional factory. 2, assembly line production, welding all the automation, quality and stability. 3, all the pressure components 100% X-ray film detection, advanced detection methods. 4, the product as a whole factory, advanced and reasonable structure, short installation period, the investment cost is low. 5, fully furnished, by manual or com...