We stick to the principle of "quality first, service first, continuous improvement and innovation to meet the customers" for the management and "zero defect, zero complaints" as the quality objective. To perfect our service, we provide the products with the good quality at the reasonable price for Condensing Gas Boilers, Industrial Electric Boiler, lpg steam boiler, We welcome new and old customers from all walks of life to contact us for future business relationships and mutual success!
Super Lowest Price Oil Fueled Boiler - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

Super Lowest Price Oil Fueled Boiler - Installation & Technology Service – Double Rings detail pictures

Super Lowest Price Oil Fueled Boiler - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

We insist on offering high quality production with good business concept, honest sales and the best and fast service. it will bring you not only the high quality product and huge profit, but the most significant is to occupy the endless market for Super Lowest Price Oil Fueled Boiler - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Guyana, Rome, Azerbaijan, We will continue to devote ourselves to market & product development and build a well-knit service to our customer to create a more prosperous future. Please contact us today to find out how we can work together.
  • The company has a good reputation in this industry, and finally it tured out that choose them is a good choice.
    5 Stars By Laurel from Salt Lake City - 2017.05.31 13:26
    This supplier's raw material quality is stable and reliable, has always been in accordance with the requirements of our company to provide the goods that quality meet our requirements.
    5 Stars By Athena from Pretoria - 2017.06.25 12:48
    Write your message here and send it to us

    Related products

    • Well-designed Biomass Pellet Boiler - Coal Boiler Biomass Boiler Reducer – Double Rings

      Well-designed Biomass Pellet Boiler - Coal Boi...

      Reducer used in DR Boiler • The main parts adopt high quality carbon structural refined steel.With high strength, high transmission efficiency and reliable operation, long service life, etc. • Respectively using multilevel, stepless frequency conversion speed regulating mode. User can reasonably match speed reducer according to the different operation condition of boiler.With the features of easy operation, energy saving, etc • With characteristics of large transmission torque and speed...

    • 8 Year Exporter Steam Pipe - Boiler Water Tank – Double Rings

      8 Year Exporter Steam Pipe - Boiler Water Tank...

      Used in Boiler Tank accessories (1) Water inlet pipe: The water inlet pipe of the water tank is generally connected from the side wall, but it can also be connected from the bottom or top. When the water tank USES the pipe network pressure to fill the water, the inlet pipe outlet should be equipped with a floating ball valve or hydraulic valve. Generally, there are not less than 2 floating ball valves. The diameter of the ball float valve is the same as that of the inlet pipe, and each ...

    • Professional Design Thermal Oil Boiler - Boiler Valve and Meter – Double Rings

      Professional Design Thermal Oil Boiler - Boile...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

    • Chinese wholesale Industrial Steam Boilers - Boiler Valve and Meter – Double Rings

      Chinese wholesale Industrial Steam Boilers - B...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

    • Factory wholesale Oil Condensing Boilers - Boiler Steam Distribution Cylinder – Double Rings

      Factory wholesale Oil Condensing Boilers - Boi...

      Used in Boiler Introduction The sub-cylinder is the main supporting equipment of the boiler. It is used to distribute the steam generated during the operation of the boiler to various pipelines. The sub-cylinder is a pressure-bearing equipment and belongs to a pressure vessel. Its pressure-bearing capacity and capacity should correspond to the supporting boiler . Main pressure components The main pressure components of the sub-cylinder are: head, shell material, etc. Usage The sub-cylin...

    • PriceList for Oil Fired Steam Boiler - Vertical Gas Oil Boiler – Double Rings

      PriceList for Oil Fired Steam Boiler - Vertica...

      Introduction : 1. Compact structure, small installation area, easy to install. 2. Good heating surface , low exhaust gas temperature 3. The world famous original burner, automatic and high efficient combustion, high combustion efficiency 4. Microcomputer automatic controller, overpressure protection and ultra-low water level automatic protection and automatic feed water . 5. Super thickness insulating layer design, good insulation effect, boiler surface temperature low, low losing he...