The company upholds the philosophy of "Be No.1 in quality, be rooted on credit and trustworthiness for growth", will continue to serve old and new customers from home and overseas whole-heatedly for boiler accessory distribution cylinder, biomass boiler water tank, industrial gas boiler, "Making the Products of High Quality" is the eternal goal of our company. We make unremitting efforts to realize the goal of "We Will Always Keep in Pace with the Time".
professional factory for Boiler Installation Material – Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

professional factory for Boiler Installation Material – Installation & Technology Service – Double Rings detail pictures

professional factory for Boiler Installation Material – Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

We are experienced manufacturer. Wining the majority from the crucial certifications of its market for professional factory for Boiler Installation Material – Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: USA, Auckland, Israel, With the spirit of "credit first, development through innovation, sincere cooperation and joint growth", our company is striving to create a brilliant future with you, so as to become a most valuable platform for exporting our products in China!
  • The factory has advanced equipment, experienced staffs and good management level, so product quality had assurance, this cooperation is very relaxed and happy!
    5 Stars By Constance from Pretoria - 2017.08.16 13:39
    Reasonable price, good attitude of consultation, finally we achieve a win-win situation,a happy cooperation!
    5 Stars By Elva from Mexico - 2018.09.08 17:09
    Write your message here and send it to us

    Related products

    • Reasonable price for Oil Fired Boilers - Vertical Wood /Coal Boiler – Double Rings

      Reasonable price for Oil Fired Boilers - Verti...

      Introduction : Vertical type boiler, adopt water&fire tube structure, suitable for coal/wood/solid material fire. Vertical boiler, thermal capacity in 100kw/200kw/300kw/350kw/500kw/600kw/700kw/1000kw per hour. Feature: * Compact, small footprint, easy installation. * Fully furnished heating surface, flue gas temperature is low. * Using the world famous original burner, implement automatic and efficient combustion, the combustion efficiency. * Microcomputer automatic control,...

    • 2019 Latest Design China Thermal Oil Boiler - Boiler Ladder and Stair – Double Rings

      2019 Latest Design China Thermal Oil Boiler - ...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

    • Factory Price For Biomass Fired Boiler - Boiler Valve and Meter – Double Rings

      Factory Price For Biomass Fired Boiler - Boile...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

    • Factory Price For Biomass Fired Boiler - Well-designed Biomass Pellet Boiler - Coal Boiler Biomass Boiler Reducer – Double Rings – Double Rings

      Factory Price For Biomass Fired Boiler - Well-...

      Reducer used in DR Boiler • The main parts adopt high quality carbon structural refined steel.With high strength, high transmission efficiency and reliable operation, long service life, etc. • Respectively using multilevel, stepless frequency conversion speed regulating mode. User can reasonably match speed reducer according to the different operation condition of boiler.With the features of easy operation, energy saving, etc • With characteristics of large transmission torque and speed...

    • Factory For Steam Tube - Boiler Installation Material – Double Rings

      Factory For Steam Tube - Boiler Installation M...

      Used in Boiler DZL 6-1.25-AII STEAM BOILER Installation Material List   Flange Stop Valve   Item  Description   Quantity 1 DN 150    1.6 MPA 1 PC 2 DN 100    1.6 MPA 1 PC 3 DN 80     1.6 MPA 1 PC 4 DN 65     1.6 MPA 2 PCS 5 DN 50     1.6 MPA 3 PCS 6 DN 40     1.6 MPA 1 PC 7 DN 15     1.6 MPA 1 PC   Flange Check Valve   Item  Description   Quantity 1 DN 50     1.6 MPA 1 PC   Flange   Item  Description   Quantity 1 DN 150      2 PCS 2 DN 100       3...

    • OEM Supply Diesel Steam Boiler - Coal Boiler Biomass Boiler I.D.Fan – Double Rings

      OEM Supply Diesel Steam Boiler - Coal Boiler B...

      I.D fan used in Coal Boiler boiler induced draft fan is designed for the industrial boiler (1-20T / h) or domestic boiler equipped with various coal quality and smoke and dust removal device. It can be selected for the same air inlet conditions and performance, but the high temperature is ≤ 250 ℃. Before induced draft, a dust removal device with efficiency ≤ 85% must be installed to ensure that the dust content of flue gas entering the fan is 400mg/m3