OEM/ODM Supplier Oil Boiler - Installation & Technology Service – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

With our superb management, potent technical capability and strict quality command procedure, we go on to provide our shoppers with trustworthy high-quality, reasonable costs and outstanding services. We goal at becoming considered one of your most trustworthy partners and earning your pleasure for Boiler Installation Material, Chinese boiler chimney, biomass boiler reducer, We sincerely welcome overseas customers to consult for the long-term cooperation and the mutual development.We strongly believe that we can do better and better.
OEM/ODM Supplier Oil Boiler - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

OEM/ODM Supplier Oil Boiler - Installation & Technology Service – Double Rings detail pictures

OEM/ODM Supplier Oil Boiler - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

We are ready to share our knowledge of marketing worldwide and recommend you suitable products at most competitive prices. So Profi Tools offer you best value of money and we are ready to develop together with OEM/ODM Supplier Oil Boiler - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: South Africa, Netherlands, Jamaica, Our mission is "Provide Goods with Reliable Quality and Reasonable Prices". We welcome customers from every corner of the world to contact us for future business relationships and achieving mutual success!
  • The company's products very well, we have purchased and cooperated many times, fair price and assured quality, in short, this is a trustworthy company!
    5 Stars By Prudence from Chile - 2017.03.07 13:42
    This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
    5 Stars By Bruno Cabrera from Chile - 2018.06.28 19:27
    Write your message here and send it to us

    Related products

    • Online Exporter Boiler Industry - Coal Boiler Biomass Boiler Multi-Tube Dust Cleaner – Double Rings

      Online Exporter Boiler Industry - Coal Boiler ...

      Used in Boiler Multi-tube dust collector belongs to cyclone type dry dust collector, mainly used for boiler and industrial dust collection. Multi-tube dust collector, a kind of cyclone dust collector. Many small cyclone dust collectors (also called cyclones) are combined in a shell and used in parallel. The diameter of the cyclone varies from 100 to 250 mm and can effectively trap 5 to 10 μm dust. It is cast with wear-resistant cast iron and can handle gas with high dust concentration (...

    • 2020 China New Design Industrial Biomass Boiler - Biomass Wood Thermal Oil Boiler – Double Rings

      2020 China New Design Industrial Biomass Boiler...

      Thermal Oil Boiler used in Textile,Foods, Rubber ,Paper, Plastic, Wood, Building Materials etc. Feature: 1.Overall structure is reasonable and compact, easy to install. 2.Advanced design, Complete structure 3. Simple water cycle, reasonable structure of pressure parts, guarantee water quality, safe to run 4. Complete Ancillary equipment, advanced comprehensive technology

    • Factory Outlets Thermal Oil Boiler - Steam&Hot Water Pipe – Double Rings

      Factory Outlets Thermal Oil Boiler - Steam&...

      Products Description Structure Steel pipe– insulation layer–steel jacket pipe Steel pipe process 1. Seamless, 2. Spiral steel pipe( SAW) 3. Straight steel pipe(ERW) Insulation layer of external sliding type Fiberglass wool or rock wool Insulation layer of internal sliding type 1. Calcium silicate insulation material 2. Polyurethane insulation material Application 1. Steam 2. Hot oil 3. Hot material Specification DN57-1020mm(1 inch-64 inch) Medium temperature...

    • Cheap PriceList for Best Oil Fired Boilers - LPG Pressure Tank – Double Rings

      Cheap PriceList for Best Oil Fired Boilers - L...

      Introduction: Pressure vessel equipment plays an important role in the petrochemical industry, the energy industry, scientific research and military sectors etc. Pressure vessel container body consist of cylinder, sealing head, flange, sealing elements, open pore and connected pipe, bearing. In addition, also equipped with safety devices, meter and safety internals for protection purpose . Pressure Vessel Main Performance Parameter List Steam Pressure1.0Mpa Inlet Temperature 250℃ S...

    • Chinese wholesale Industrial Steam Boilers - Double Drum Steam Boiler – Double Rings

      Chinese wholesale Industrial Steam Boilers - D...

      Coal Steam Boiler-Used in Foods, Textile, Plywood,Paper Brewery,Rice Mill etc.. Introduction : SZL Series assembled water tube boiler adopts longitudinal double drum chain grate boiler. The boiler body is composed of up& down longitudinal drums and convection tube, best heating surface, high thermal efficiency, reasonable design, compact structure, elegant appearance, adequate effect. Two side of Combustion chamber equipped the light pipe water wall tube, up drum equip steam ...

    • 18 Years Factory Oil Fired Combi Boiler - Single Drum Steam Boiler – Double Rings

      18 Years Factory Oil Fired Combi Boiler - Sing...

      Introduction : Single Drum Chain Grate Coal fired boiler is horizontal three-back water fire pipe composite boiler. Fix fire tube in drum and the light pipe water wall is fixed on the right and left sides of the furnace. With light chain grate stoker for mechanical feeding and by the draft fan and blower for mechanical ventilation, realize mechanical taphole by scraper slag remover. The hopper of fuel drops to grate bar, then enter furnace for burning, by the ashes room above the back arch, t...