OEM manufacturer Lpg Hot Water Boiler - Boiler Water Tank – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

Our firm aims to operating faithfully, serving to all of our shoppers , and working in new technology and new machine regularly for vertical coal boiler, Steam Generator Boiler, electric boiler, Welcome worldwide customers to contact us for business and long-term cooperation. We will be your reliable partner and supplier of auto parts and accessories in China.
OEM manufacturer Lpg Hot Water Boiler - Boiler Water Tank – Double Rings Detail:

Used in Boiler

Tank accessories
(1) Water inlet pipe: The water inlet pipe of the water tank is generally connected from the side wall, but it can also be connected from the bottom or top.
When the water tank USES the pipe network pressure to fill the water, the inlet pipe outlet should be equipped with a floating ball valve or hydraulic valve.
Generally, there are not less than 2 floating ball valves.
The diameter of the ball float valve is the same as that of the inlet pipe, and each ball float valve shall be equipped with an inspection valve before it.
(2) Outlet pipe: the outlet pipe of the water tank can be connected from the side wall or the bottom.
The bottom of the outlet pipe connected from the side wall or the top surface of the outlet pipe connected from the bottom shall be 50 mm higher than the bottom of the water tank.
The outlet pipe shall be equipped with gate valve.
The inlet and outlet pipes of the water tank should be set separately. When the inlet and outlet pipes are the same pipe, check valve should be installed on the outlet pipe.
When it is necessary to install check valves, swing check valves with less resistance should be used instead of lifting check valves, and the elevation should be more than 1m below the lowest water level of the water tank.
When a water tank is used jointly by life and fire control, the check valve on the fire control outlet pipe should be lower than the pipe top of the domestic water outflow siphon (when the vacuum of the domestic siphon is destroyed when the water is lower than the pipe top, only the water flow out of the fire control outlet pipe is guaranteed at least 2M, so that it has a certain pressure to push the check valve.
When a fire occurs, the fire water reserve can really play a role.
(3) Overflow pipe: the overflow pipe of the water tank can be connected out from the side wall or the bottom, and its pipe diameter shall be determined according to the maximum inlet flow of the discharge tank, and shall be larger than the intake pipe L-2.
Valves shall not be installed on the overflow pipe.
The overflow pipe shall not be directly connected with the drainage system, and indirect drainage shall be adopted. Measures shall be taken on the overflow pipe to prevent the entry of dust, insects, mosquitoes and flies, such as water seal and filter screen, etc.
(4) Drain pipe: the water tank drain pipe should be connected from the lowest part of the bottom.
Drain pipe Figure 2-2N The water tank for fire fighting and living table is equipped with a gate valve (should not be equipped with a cut-off valve), which can be connected with the overflow pipe, but not directly connected with the drainage system.
Drainage pipe diameter generally adopts DN50 when there is no special requirement.
(5) Ventilation pipe: The water tank for drinking water shall be provided with a sealed box cover, and the box cover shall be provided with access hole and ventilation pipe.
Ventilation pipe can be extended to indoor or outdoor, but not to harmful gases. The nozzle should have a filter screen to prevent dust, insects and flies from entering. Generally, the nozzle should be set down.
Ventilation pipe shall not be equipped with valves, water seals and other devices that interfere with ventilation.
Ventilation pipe shall not be connected with drainage system and ventilation duct.
Ventilation pipe generally adopts the diameter of DN50.
(6) Liquid level meter: Generally, glass liquid level meter should be installed on the side wall of the water tank to indicate the water level on the spot.
When the length of one liquid level gauge is insufficient, two or more liquid level gauges can be installed up and down.
The overlap part of two adjacent liquid level gauges should not be less than 70mm, as shown in Figure 2-22.
If there is no liquid level signal timing in the water tank, signal tube can be set to give the overflow signal.
The signal tube is generally connected from the side wall of the water tank, and its height should be set so that the bottom of the tube is level with the bottom of the overflow tube or the overflow water surface of the flared mouth.
Generally, the diameter of the pipe is DNl5 signal pipe, which can be connected to the washbasin, washing basin and other places in the room where there are often people on duty.
If the level of the water tank is interlocked with the water pump, the level relay or signal device shall be installed on the side wall or top cover of the water tank. The commonly used level relay or signal device includes float ball type, pole type, capacitance type and float type, etc.
The high and low electric hanging water level of the water tank with water pump pressure should be considered to maintain a certain safe volume. The maximum electric control water level at the moment of stopping the pump should be 100 mm lower than the overflow water level, while the minimum electric control water level at the moment of starting the pump should be 20mm higher than the design minimum water level, so as to avoid overflow or cavitation caused by error.
(7) Water tank cover, internal and external ladder.
BOILER WATER TANK


Product detail pictures:

OEM manufacturer Lpg Hot Water Boiler - Boiler Water Tank – Double Rings detail pictures

OEM manufacturer Lpg Hot Water Boiler - Boiler Water Tank – Double Rings detail pictures


Related Product Guide:
Boiler Structure

We can always satisfy our respected customers with our good quality, good price and good service due to we are more professional and more hard-working and do it in cost-effective way for OEM manufacturer Lpg Hot Water Boiler - Boiler Water Tank – Double Rings , The product will supply to all over the world, such as: Doha, Iceland, Estonia, If you are for any reason unsure which product to select, do not hesitate to contact us and we are going to be delighted to advise and assist you. This way we are going to be providing you with all the knowledge needed to make the best choice. Our company strictly follows "Survive by good quality, Develop by keeping good credit. " operation policy. Welcome all the clients old and new to visit our company and talk about the business. We have been looking for more and more customers to create the glorious future.
  • In general, we are satisfied with all aspects, cheap, high-quality, fast delivery and good procuct style, we will have follow-up cooperation!
    5 Stars By Bernice from Durban - 2018.07.12 12:19
    This is a very professional wholesaler, we always come to their company for procurement, good quality and cheap.
    5 Stars By Jane from New Orleans - 2018.09.29 13:24
    Write your message here and send it to us

    Related products

    • Professional China Water Tube Boiler - Coal Boiler Chain Grate – Double Rings

      Professional China Water Tube Boiler - Coal Bo...

      More phtos The patent material  RTSiCr,RQTSi4Mo which is our company’s unique material. High temperature resistance, Special process, longer service life.   Travelling type grate stoker Spare Parts—Grate Bar The structure is simple, the metal consumption is small, the ventilation section ratio is large, and the strength and performance requirements of the driving shaft, the driven shaft and the grate are high.

    • New Fashion Design for New Boiler Deals - Double Drum Hot Water Boiler – Double Rings

      New Fashion Design for New Boiler Deals - Doub...

      Parameter : SZL Bearing Pressure Hot water Boiler Main Technology Parameter List ModelItem SZL2.8-1.0/115/70-AIISZL2.8-1.25/130/70-AII SZL4.2-1.0/115/70-AIISZL4.2-1.25/130/70-AII SZL5.6-1.0/115/70-AIISZL5.6-1.25/130/70-AII Rated Capacity   2.8T/h 4.2 T/h 5.6 T/h Rated Working Pressure Mpa 1.0/1.25 1.0/1.25 1.0/1.25 Rated Steam Temp. ℃ 115/130 115/130 115/130 Feed Water Temp. ℃ 70 70 70 Fuel Consumption  Kg/H ~580 ~900 ~1130 Thermal Efficiency  % 78 80 80 Heating Surface Boil...

    • Cheap price China Industrial Boiler - LPG Pressure Tank – Double Rings

      Cheap price China Industrial Boiler - LPG Pres...

      Introduction: Pressure vessel equipment plays an important role in the petrochemical industry, the energy industry, scientific research and military sectors etc. Pressure vessel container body consist of cylinder, sealing head, flange, sealing elements, open pore and connected pipe, bearing. In addition, also equipped with safety devices, meter and safety internals for protection purpose . Pressure Vessel Main Performance Parameter List Steam Pressure1.0Mpa Inlet Temperature 250℃ S...

    • Factory directly supply Heat Boilers - SZS Gas Oil PLG Boiler – Double Rings

      Factory directly supply Heat Boilers - SZS Gas...

      Introduction : SZS series boiler body is longitudinal 2-drum, D-type chamber combustion strueture. The furnace is on right side and the convection bank tube is on left side. The body is fixed on the body chassis by flexible supports in the middle and two ends of the lower drum,can secure to let the whole boiler body to expand sideways. Surround furnace there are narrow space membrane cooling tube wall. It is totally sealed and separated between the membrane wall on furnace left side and the c...

    • Big Discount Electric Hot Water Boilers - SZS Gas Oil PLG Boiler – Double Rings

      Big Discount Electric Hot Water Boilers - SZS ...

      Introduction : SZS series boiler body is longitudinal 2-drum, D-type chamber combustion strueture. The furnace is on right side and the convection bank tube is on left side. The body is fixed on the body chassis by flexible supports in the middle and two ends of the lower drum,can secure to let the whole boiler body to expand sideways. Surround furnace there are narrow space membrane cooling tube wall. It is totally sealed and separated between the membrane wall on furnace left side and the c...

    • Cheap PriceList for Best Oil Fired Boilers - Boiler Ladder and Stair – Double Rings

      Cheap PriceList for Best Oil Fired Boilers - B...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...