With a positive and progressive attitude to customer's interest, our enterprise continually improves our products excellent to meet the wants of customers and further focuses on safety, reliability, environmental requirements, and innovation of waste heat boiler, Heating Water Boiler, bagasse fired steam boiler, We sincerely welcome friends from all around the globe to cooperate with us within the foundation of long-term mutual benefits.
Good quality Boiler In Thermal Power Plant - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

Good quality Boiler In Thermal Power Plant - Installation & Technology Service – Double Rings detail pictures

Good quality Boiler In Thermal Power Plant - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

With this motto in mind, we've come to be one of quite possibly the most technologically innovative, cost-efficient, and price-competitive manufacturers for Good quality Boiler In Thermal Power Plant - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Serbia, Barcelona, United States, Our domestic website's generated over 50, 000 purchasing orders every year and quite successful for internet shopping in Japan. We would be happy to have an opportunity to do business with your company. Looking forward to receiving your message !
  • Problems can be quickly and effectively resolved, it is worth to be trust and working together.
    5 Stars By Quyen Staten from New York - 2017.11.29 11:09
    Sales manager is very enthusiastic and professional, gave us a great concessions and product quality is very good,thank you very much!
    5 Stars By Sophia from Milan - 2018.06.30 17:29
    Write your message here and send it to us

    Related products

    • Popular Design for Water Boilers - Biomass Wood Thermal Oil Boiler – Double Rings

      Popular Design for Water Boilers - Biomass Woo...

      Thermal Oil Boiler used in Textile,Foods, Rubber ,Paper, Plastic, Wood, Building Materials etc. Feature: 1.Overall structure is reasonable and compact, easy to install. 2.Advanced design, Complete structure 3. Simple water cycle, reasonable structure of pressure parts, guarantee water quality, safe to run 4. Complete Ancillary equipment, advanced comprehensive technology

    • Manufacturing Companies for Coal Boiler For Sale - Vertical Gas Oil Boiler – Double Rings

      Manufacturing Companies for Coal Boiler For Sal...

      Introduction : 1. Compact structure, small installation area, easy to install. 2. Good heating surface , low exhaust gas temperature 3. The world famous original burner, automatic and high efficient combustion, high combustion efficiency 4. Microcomputer automatic controller, overpressure protection and ultra-low water level automatic protection and automatic feed water . 5. Super thickness insulating layer design, good insulation effect, boiler surface temperature low, low losing he...

    • Top Quality Oil Central Heating - Boiler Flue – Double Rings

      Top Quality Oil Central Heating - Boiler Flue ...

      Used in Boiler Introduction Industrial smoke exhaust, air into the pipe, the pipe is equipped with a damper (valve) to regulate the wind speed and pressure in the pipe. It is composed of furnace wall, partial heating surface pipe and cladding wall pipe to guide the flow of smoke, and through each heating surface for heat exchange, divided into horizontal flue and tail flue. The main smoke duct section size of the large capacity boiler is very large, in order to bear and transfer the loa...

    • OEM Manufacturer Lpg Steam Boiler - Pellets Shells Husk Biomass Boiler – Double Rings

      OEM Manufacturer Lpg Steam Boiler - Pellets Sh...

      Parameter : DZG(L)Horizontal Type Biomass-Burning Steam Boiler Main Technology Parameter List Model DZG2-1.0-S DZL2-1.25-S DZL2-1.57-S DZL2-2.45-S   DZG4-1.25-S DZL4-1.25-S DZL4-1.57-S DZL4-2.45-S DZL6-1.25-S DZL6-1.57-S DZL6-2.45-S  DZL8-1.25-S DZL8-1.57-S DZL8-2.45-S DZL10-1.25-S DZL10-1.57-S DZL10-2.45-S Rated Capacity T/h 2 4 6 8 10 Rated Working Pressure Mpa 1.0/1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 1.25/1.57/2.45 Rated Steam Temp. ℃ 183/194/204/226 194/2...

    • Top Quality Oil Central Heating - Coal Fired Thermal Oil Boiler – Double Rings

      Top Quality Oil Central Heating - Coal Fired T...

      Introduction Thermol Oil boiler uses coal, heavy oil, light oil, combustible gas and other combustible materials as fuel, heat transfer oil as the heat carrier, and uses a circulating oil pump to force a liquid phase to circulate. After the heat energy is transferred to the heating equipment, it is then returned to reheat. Direct current special industrial furnace, heat transfer oil, also known as organic heat carrier or heat medium oil, has been used as an intermediate heat transfer me...

    • New Delivery for Boiler Manufacturing - Coal Boiler Biomass Boiler Slag Remover – Double Rings

      New Delivery for Boiler Manufacturing - Coal B...

      Slag Remover used in Coal Boiler Introduction The Slag Remover is a kind of boiler slag tapping equipment. The carbon slag produced after the coal is burned in the boiler is pushed to the slag storage pit by the grate, and is dragged out of the furnace by the slag machine to clear the slag accumulation.  Technology The high-temperature slag discharged from the furnace is first crushed into small pieces by a pair-roller slag breaker, which is convenient for cooling and transportation; th...