Our merchandise are commonly recognized and reliable by customers and can meet constantly developing economic and social desires for Boiler Electrical, Boiler Power Plant, boiler tube for sale, We have now four leading solutions. Our products are most effective sold not only during the Chinese market, but also welcomed during the international industry.
Chinese Professional Gas Steam Boiler - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

Chinese Professional Gas Steam Boiler - Installation & Technology Service – Double Rings detail pictures

Chinese Professional Gas Steam Boiler - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

owing to good service, a variety of high quality products, competitive prices and efficient delivery, we enjoy a good reputation among our customers. We are an energetic company with wide market for Chinese Professional Gas Steam Boiler - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Ghana, Greece, Georgia, Since our establishment, we keep on improving our products and customer service. We are able to provide you with a wide range of high quality hair products at competitive prices. Also we can produce different hair products according to your samples. We insist on high quality and reasonable price. Except this, we provide best OEM service. We warmly welcome OEM orders and customers all over the world to cooperate with us for mutual development in the future.
  • This supplier offers high quality but low price products, it is really a nice manufacturer and business partner.
    5 Stars By Sabrina from New Zealand - 2017.11.29 11:09
    We are long-term partners, there is no disappointment every time, we hope to maintain this friendship later!
    5 Stars By Rose from Lebanon - 2017.09.28 18:29
    Write your message here and send it to us

    Related products

    • Top Suppliers Industrial Boiler Ltd - Boiler Tube – Double Rings

      Top Suppliers Industrial Boiler Ltd - Boiler T...

      More Photos Boiler Steel Pipe/Tube is a kind of seamless steel pipe. The manufacturing method is the same as seamless steel pipes, but there are strict requirements for the steel grades used to manufacture boiler steel pipes. According to the temperature level, it is divided into two types: low pressure boiler tube and high pressure boiler tube.

    • Factory Price For Electric Boiler - Gas oil Boiler Economizer – Double Rings

      Factory Price For Electric Boiler - Gas oil Bo...

      More photo Boiler economizers are heat exchange devices with finned tubes that heat a liquid, sometimes water, up to however sometimes doesn’t exceed the boiling purpose of liquid. We can manufacture three types of boiler economizer, bare tube economizer, H finned tube economizer and spiral finned tube economizer. H-finned tube economizer is high efficient heat exchanger economizer which is consisted of H-finned tubes.

    • 2019 China New Design Steam Boiler Price - Installation & Technology Service – Double Rings

      2019 China New Design Steam Boiler Price - Ins...

      Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...

    • Manufacturing Companies for Coal Boiler For Sale - Vertical Gas Oil Boiler – Double Rings

      Manufacturing Companies for Coal Boiler For Sal...

      Introduction : 1. Compact structure, small installation area, easy to install. 2. Good heating surface , low exhaust gas temperature 3. The world famous original burner, automatic and high efficient combustion, high combustion efficiency 4. Microcomputer automatic controller, overpressure protection and ultra-low water level automatic protection and automatic feed water . 5. Super thickness insulating layer design, good insulation effect, boiler surface temperature low, low losing he...

    • factory low price Hot Water Pipe - Biomass Wood Thermal Oil Boiler – Double Rings

      factory low price Hot Water Pipe - Biomass Woo...

      Thermal Oil Boiler used in Textile,Foods, Rubber ,Paper, Plastic, Wood, Building Materials etc. Feature: 1.Overall structure is reasonable and compact, easy to install. 2.Advanced design, Complete structure 3. Simple water cycle, reasonable structure of pressure parts, guarantee water quality, safe to run 4. Complete Ancillary equipment, advanced comprehensive technology

    • OEM China Diesel Hot Water Boiler - Boiler Flue – Double Rings

      OEM China Diesel Hot Water Boiler - Boiler Flu...

      Used in Boiler Introduction Industrial smoke exhaust, air into the pipe, the pipe is equipped with a damper (valve) to regulate the wind speed and pressure in the pipe. It is composed of furnace wall, partial heating surface pipe and cladding wall pipe to guide the flow of smoke, and through each heating surface for heat exchange, divided into horizontal flue and tail flue. The main smoke duct section size of the large capacity boiler is very large, in order to bear and transfer the loa...