China Supplier Electricity Boiler - Installation & Technology Service – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

We're committed to providing easy,time-saving and money-saving one-stop purchasing service of consumer for boiler accessory collectionboiler auxiliary coolingchinese cooling water collection, Oil Fired Steam Boiler, pellet steam boiler, With our rules of " small business standing, partner trust and mutual benefit", welcome all of you to definitely do the job alongside one another , grow together.
China Supplier Electricity Boiler - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

China Supplier Electricity Boiler - Installation & Technology Service – Double Rings detail pictures

China Supplier Electricity Boiler - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

The pretty loaded projects management experiences and one to a person support model make the high importance of business enterprise communication and our easy understanding of your expectations for China Supplier Electricity Boiler - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Kenya, South Africa, Ecuador, We guarantee that our company will try our best to reduce customer purchase cost , shorten the period of purchase , stable products quality , increase customers' satisfaction and achieve win-win situation .
  • The company comply with the contract strict, a very reputable manufacturers, worthy a long-term cooperation.
    5 Stars By Eden from Milan - 2018.02.04 14:13
    This is a reputable company, they have a high level of business management, good quality product and service, every cooperation is assured and delighted!
    5 Stars By Lauren from French - 2018.07.12 12:19
    Write your message here and send it to us

    Related products

    • OEM Supply Diesel Steam Boiler - Boiler Tube – Double Rings

      OEM Supply Diesel Steam Boiler - Boiler Tube &...

      More Photos Boiler Steel Pipe/Tube is a kind of seamless steel pipe. The manufacturing method is the same as seamless steel pipes, but there are strict requirements for the steel grades used to manufacture boiler steel pipes. According to the temperature level, it is divided into two types: low pressure boiler tube and high pressure boiler tube.

    • 8 Year Exporter Stoker Fired Boiler - Coal Boiler Biomass Boiler Chimney – Double Rings

      8 Year Exporter Stoker Fired Boiler - Coal Boi...

      Used in Boiler The height of a chimney affects its ability to deliver flue gas to the external environment through the chimney effect. In addition, the diffusion of pollutants using chimneys at high altitudes can reduce the impact on the surrounding environment. A chimney high enough to allow the chemicals in the air to partially or completely neutralize themselves before reaching the ground level, in the case of chemical erosion. Dispersion of pollutants over a larger area reduces their conc...

    • China Supplier Electricity Boiler - Coal Boiler Biomass Boiler Multi-Tube Dust Cleaner – Double Rings

      China Supplier Electricity Boiler - Coal Boile...

      Used in Boiler Multi-tube dust collector belongs to cyclone type dry dust collector, mainly used for boiler and industrial dust collection. Multi-tube dust collector, a kind of cyclone dust collector. Many small cyclone dust collectors (also called cyclones) are combined in a shell and used in parallel. The diameter of the cyclone varies from 100 to 250 mm and can effectively trap 5 to 10 μm dust. It is cast with wear-resistant cast iron and can handle gas with high dust concentration (...

    • Professional China Water Tube Boiler - Coal Boiler Chain Grate – Double Rings

      Professional China Water Tube Boiler - Coal Bo...

      More phtos The patent material  RTSiCr,RQTSi4Mo which is our company’s unique material. High temperature resistance, Special process, longer service life.   Travelling type grate stoker Spare Parts—Grate Bar The structure is simple, the metal consumption is small, the ventilation section ratio is large, and the strength and performance requirements of the driving shaft, the driven shaft and the grate are high.

    • Hot-selling Industrial Electric Boiler - Boiler Ladder and Stair – Double Rings

      Hot-selling Industrial Electric Boiler - Boile...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

    • Well-designed Biomass Pellet Boiler - Single Drum Hot Water Boiler – Double Rings

      Well-designed Biomass Pellet Boiler - Single D...

      Parameter : DZG(L)Bearing Pressure Hot water boiler Main Technology Parameter List Model DZG0.7-0.7/95/70 DZL0.7-0.7/95/70  DZG1.4-0.7/95/70 DZL1.4-0.7/95/70 DZL1.4-1.0/115/70 DZL28-1.0/115/70 DZL2.8-1.25/130/70 DZL4.2-1.0/115/70 DZL4.2-1.25/130/70 Rated Capacity T/h 0.7 1.4 2.8 4.2 Rated Working Pressure Mpa 0.7 0.7/1.0 1.0/1.25 1.0/1.25 Rated Steam Temp. ℃ 95 95/115 115/130 115/130 Feed Water Temp. ℃ 70 70 70 70 Fuel Consumption  Kg/H ~150 ~310 ~590 ~900 Thermal Efficiency ...