Packing Boiler and ship to Sri Lanka

The 2T Boiler was produced 30 days and now, it was being packed and ship to Colombo,Sri Lanka.

Contact Email:Mr. Xu Kun.
doublerings@aiboiler.com

check boiler each step checking boiler Boiler body packing 40OT packing boiler packing boiler Boiler packed into container


Post time: Mar-18-2021