We consistently carry out our spirit of ''Innovation bringing development, Highly-quality ensuring subsistence, Management promoting benefit, Credit attracting customers for coal boiler induced draft fan, pellet thermal oil boiler, Boiler In Thermal Power Plant, At our firm with quality first as our motto, we manufacture products that are entirely made in Japan, from materials procurement to processing. This enables them to be used with confident peace of mind.
2019 China New Design Steam Boiler Price - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

2019 China New Design Steam Boiler Price - Installation & Technology Service – Double Rings detail pictures

2019 China New Design Steam Boiler Price - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

Together with the "Client-Oriented" enterprise philosophy, a arduous good quality control technique, sophisticated producing equipment and a sturdy R&D staff, we generally offer superior quality merchandise, superb solutions and aggressive rates for 2019 China New Design Steam Boiler Price - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: United States, United Arab Emirates, Nigeria, We will not only continuously introduce technical guidance of experts from both home and abroad, but also develop the new and advanced products constantly to satisfactorily meet the needs of our clients all over the world.
  • Reasonable price, good attitude of consultation, finally we achieve a win-win situation,a happy cooperation!
    5 Stars By Delia Pesina from Argentina - 2018.09.19 18:37
    The goods are very perfect and the company sales manager is warmful, we will come to this company to purchase next time.
    5 Stars By olivier musset from Mecca - 2017.08.21 14:13
    Write your message here and send it to us

    Related products

    • Factory Supply High Pressure Steam Boiler - SZS Gas Oil PLG Boiler – Double Rings

      Factory Supply High Pressure Steam Boiler - SZ...

      Introduction : SZS series boiler body is longitudinal 2-drum, D-type chamber combustion strueture. The furnace is on right side and the convection bank tube is on left side. The body is fixed on the body chassis by flexible supports in the middle and two ends of the lower drum,can secure to let the whole boiler body to expand sideways. Surround furnace there are narrow space membrane cooling tube wall. It is totally sealed and separated between the membrane wall on furnace left side and the c...

    • factory Outlets for Coal Fired Furnace - Biomass Hot Water Boiler – Double Rings

      factory Outlets for Coal Fired Furnace - Bioma...

      Introduction : Biomass boiler is horizontal three-back water fire pipe composite boiler. The fuel can be Biomass,coal,wood,rice husk,shells,pellets,bagasse,waste etc.. Display Feature: 1. High thermal efficiency 2. By mechanize operation, reduce intensity of labour of stoker. 3. Easy for installation, when on site, only install slag remover, valve, pipe, water and power, etc., the boiler can be launched into running, additionally, the firing is fast. 4. Easy for installation and moving, save...

    • 8 Year Exporter Stoker Fired Boiler - Biomass Wood Thermal Oil Boiler – Double Rings

      8 Year Exporter Stoker Fired Boiler - Biomass ...

      Thermal Oil Boiler used in Textile,Foods, Rubber ,Paper, Plastic, Wood, Building Materials etc. Feature: 1.Overall structure is reasonable and compact, easy to install. 2.Advanced design, Complete structure 3. Simple water cycle, reasonable structure of pressure parts, guarantee water quality, safe to run 4. Complete Ancillary equipment, advanced comprehensive technology

    • Big discounting Boiler For Hot Water Heating System - Vertical Gas Oil Boiler – Double Rings

      Big discounting Boiler For Hot Water Heating Sy...

      Introduction : 1. Compact structure, small installation area, easy to install. 2. Good heating surface , low exhaust gas temperature 3. The world famous original burner, automatic and high efficient combustion, high combustion efficiency 4. Microcomputer automatic controller, overpressure protection and ultra-low water level automatic protection and automatic feed water . 5. Super thickness insulating layer design, good insulation effect, boiler surface temperature low, low losing he...

    • 2019 Good Quality Cfb Boiler - Gas Oil Thermal Oil Boiler – Double Rings

      2019 Good Quality Cfb Boiler - Gas Oil Thermal...

      Introduction The gas-fired Thermol Oil Boiler uses a closed cycle for heat supply and liquid phase transport of heat energy, which has the characteristics of less heat loss, and effectively prolongs the life of the boiler, energy saving and environmental protection. The inside of the furnace adopts a three-circuit tube design and a direct flow structure to ensure the safety of the boiler and effectively extend the service life of the boiler. The coil structure increases the heating surf...

    • High definition Industrial Steam Generator - Oil Steam Boiler – Double Rings

      High definition Industrial Steam Generator - O...

      Introduction : WNS series steam boiler burning oil or gas is Horizontal internal combustion three backhaul fire tube boiler, adopts boiler furnace wet back structure, high temperature smoke, gas turn to scour the second and third backhaul smoke tube plate, then after the smoke chamber. discharged into the atmosphere through the chimney. There are the front and back Smokebox Cap in the boiler, easy to maintenance. Excellent burner adopts combustion automatic ratio adjustment , feedwater ...