We always follow the principle "Quality Very first, Prestige Supreme". We have been fully committed to delivering our customers with competitively priced high-quality products and solutions, prompt delivery and experienced services for Gas Boiler Hot Water, ce coke boiler, natural gas steam boiler, We are expecting to cooperate with you on the basis of mutual benefits and common development. We will never disappoint you.
18 Years Factory Industrial Electric Boiler - Installation & Technology Service – Double Rings Detail:

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant Time One Year for Whole Boiler without mistake operation after shipment.
Technology Service For life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance Installation After finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
Commissioning After installed, the boiler will be commissioning and training for 2days.
Charge The buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.

 


Product detail pictures:

18 Years Factory Industrial Electric Boiler - Installation & Technology Service – Double Rings detail pictures

18 Years Factory Industrial Electric Boiler - Installation & Technology Service – Double Rings detail pictures


Related Product Guide:
Boiler Structure

We usually perform being a tangible workforce making sure that we will give you the most beneficial excellent plus the finest selling price for 18 Years Factory Industrial Electric Boiler - Installation & Technology Service – Double Rings , The product will supply to all over the world, such as: Swaziland, Hongkong, Plymouth, As an experienced factory we also accept customized order and make it same as your picture or sample specifying specification and customer design packing. The main goal of the company is to live a satisfactory memory to all the customers,and establish a long term win-win business relationship. For more information,please contact us. And it's our great pleasure if you like to have a personally meeting in our office.
  • We have been appreciated the Chinese manufacturing, this time also did not let us disappoint,good job!
    5 Stars By Modesty from Qatar - 2018.07.12 12:19
    It can be said that this is a best producer we encountered in China in this industry, we feel lucky to work with so excellent manufacturer.
    5 Stars By Alan from Morocco - 2017.12.31 14:53
    Write your message here and send it to us

    Related products

    • Fixed Competitive Price Heat Boilers - Coal Boiler Biomass Boiler Water Flim Dust Cleaner – Double Rings

      Fixed Competitive Price Heat Boilers - Coal Bo...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

    • High reputation Industrial Gas Boiler - Pressure Vessel – Double Rings

      High reputation Industrial Gas Boiler - Pressu...

      Introduction: Pressure vessel equipment plays an important role in the petrochemical industry, the energy industry, scientific research and military sectors etc. Pressure vessel container body consist of cylinder, sealing head, flange, sealing elements, open pore and connected pipe, bearing. In addition, also equipped with safety devices, meter and safety internals for protection purpose . Pressure Vessel Main Performance Parameter List Steam Pressure1.0Mpa Inlet Temperature 250℃ S...

    • Hot-selling Industrial Electric Boiler - Double Drum Steam Boiler – Double Rings

      Hot-selling Industrial Electric Boiler - Doubl...

      Coal Steam Boiler-Used in Foods, Textile, Plywood,Paper Brewery,Rice Mill etc.. Introduction : SZL Series assembled water tube boiler adopts longitudinal double drum chain grate boiler. The boiler body is composed of up& down longitudinal drums and convection tube, best heating surface, high thermal efficiency, reasonable design, compact structure, elegant appearance, adequate effect. Two side of Combustion chamber equipped the light pipe water wall tube, up drum equip steam ...

    • Factory Supply High Pressure Steam Boiler - Oil Steam Boiler – Double Rings

      Factory Supply High Pressure Steam Boiler - Oi...

      Introduction : WNS series steam boiler burning oil or gas is Horizontal internal combustion three backhaul fire tube boiler, adopts boiler furnace wet back structure, high temperature smoke, gas turn to scour the second and third backhaul smoke tube plate, then after the smoke chamber. discharged into the atmosphere through the chimney. There are the front and back Smokebox Cap in the boiler, easy to maintenance. Excellent burner adopts combustion automatic ratio adjustment , feedwater ...

    • Factory made hot-sale Boiler Accessory - Boiler Water Pump – Double Rings

      Factory made hot-sale Boiler Accessory - Boile...

      Water Pump used in Boiler Components in contact with water—made of  SS304 or SS316 Head:  4~305m Flow rate:0.4~240m^3/h Phase: single phase or three phase Power: 220V/380V Connection: flange or threaded

    • Leading Manufacturer for Bosch Boiler - Vertical Wood /Coal Boiler – Double Rings

      Leading Manufacturer for Bosch Boiler - Vertic...

      Introduction : Vertical type boiler, adopt water&fire tube structure, suitable for coal/wood/solid material fire. Vertical boiler, thermal capacity in 100kw/200kw/300kw/350kw/500kw/600kw/700kw/1000kw per hour. Feature: * Compact, small footprint, easy installation. * Fully furnished heating surface, flue gas temperature is low. * Using the world famous original burner, implement automatic and efficient combustion, the combustion efficiency. * Microcomputer automatic control,...