Installation & Technology Service

Short Description:

Installation Technology Service will be supplied by XUZHOU DOUBLE RINGS MACHINERY CO.,LTD to keep our product for good quality.


Product Detail

Installation Procedure

Step 1. Slag Extruder put into Foundation|
Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair.
Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue.
Step 4. Connect Economizer ( Up Parts) and Gas Flue.
Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak.
Step 6. Lift Dust Cleaner to Foundation.
Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer .
Step 8. Lift I.D Fan to Foundation
Step 9. Connect and fix the Gas Flue between Dust Cleaner and I.D Fan .
Step 10. Lift and Install Chimney , Connect I.D Fan with Chimney.
Step 11. Install F.D Fan
Step 12. Install Coal Feeder
Step 13. Install Reducer
Step 14. Install Valve&Gauge in Boiler Body
Install Valve&Gauge of Economizer
Step 15. Install Steam Distribution Cylinder,connect Main Steam Pipe and Valve&Gauge.
Customer arrange Steam Pipe Route according to the real situation in their factory.
Step 16. Install Water Pump and Valve&Gauge
Customer arrange Water Pipe Route according to the real situation in their factory.
Vertical Style Stainless Steel Water Pump need Vertically Installation.
Step 17. Install the Light,Motor Electric Wire and Electric Control Cabinet
Customer arrange Electric Wire Route according to the real situation in their factory.
Step 18. Install Water Treatment
All Boiler Installation Finish
Steam Boiler Equipment Layout
Note: This Procedure was recommended by Double Rings. Real Operation is according to local situation and Manual.   Photos in the paper is just to display.Real Equipments are subject to actual receipt cargo.

Service after Sale

Service after Sale:
Warrant TimeOne Year for Whole Boiler without mistake operation after shipment.
Technology ServiceFor life.Customer has any questions about the boiler, our engineers will serve and supply the Technology Service immediately.
Guidance InstallationAfter finish the foundation and boiler arrived in the customer’s factory,two engineers will go to customer’s factory to guidance installation with local workers .
CommissioningAfter installed, the boiler will be commissioning and training for 2days.
ChargeThe buyer should provide air tickets with round trip, accommodation, food and local communication and transportation for the engineers, plus the subsidy  for each engineer.


  • Previous: Double Drum Steam Boiler
  • Next: Boiler Valve and Meter

  • Related products

    • Double Drum Hot Water Boiler

      Double Drum Hot Water Boiler

      Double Drum Hot Water Boiler SZL Series assembled water tube boiler adopts longitudinal double drum chain grate boiler.

    • Gas oil Boiler Burner

      Gas oil Boiler Burner

      Burner for Gas boiler and Oil boiler to bring the fire for the boiler .

    • Autoclave and Boiler

      Autoclave and Boiler

      The autoclave system Double Rings produced absorbs the advantages of similar foreign products from the development. Main pressure autoclave components of the finite element analysis and various stress experiments, improved the strength calculation.

    • Single Drum Steam Boiler

      Single Drum Steam Boiler

      Single Chain Fix Chain Coal fired steam boiler will manually feed coal and be suitable for many kind low value fuel .

    • Coke Boiler

      Coke Boiler

      DZH Coking coal Boiler adopts high efficient heat transfer components - threaded pipe, with a reasonable flue flow rate, boiler efficiency is higher than the national professional standards 6~8%

    • Gas Oil Thermal Oil Boiler

      Gas Oil Thermal Oil Boiler

      Thermal oil boiler uses transfer oil as medium, fuel could be gas/oil/coal/biomass, adopts horizontal chamber combustion three-coil structure, and its body is composed of outer oil, middle oil, inner oil and rear oil.

    • Vertical Gas Oil Boiler

      Vertical Gas Oil Boiler

      Vertical Gas Boiler and Oil Boiler is Compact structure, small installation area, easy to install.

    • Gas Steam Boiler

      Gas Steam Boiler

      Gas Steam Boiler WNS series steam boiler burning oil or gas is Horizontal internal combustion three backhaul fire tube boiler, adopts boiler furnace wet back structure, high temperature smoke, gas turn to scour the second and third backhaul smoke tube pl