Newly Arrival High Efficiency Gas Boiler - Boiler Water Pump – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

Dependable high-quality and fantastic credit standing are our principles, which will help us at a top-ranking position. Adhering to your tenet of "quality very first, client supreme" for China Biomass Boiler, boiler termoelectric, Heat Boilers, We warmly welcome clients, enterprise associations and mates from all over the globe to speak to us and find cooperation for mutual rewards.
Newly Arrival High Efficiency Gas Boiler - Boiler Water Pump – Double Rings Detail:

Water Pump used in Boiler

Components in contact with water—made of  SS304 or SS316
Head:  4~305m
Flow rate:0.4~240m^3/h
Phase: single phase or three phase
Power: 220V/380V
Connection: flange or threaded

water-pump


Product detail pictures:

Newly Arrival High Efficiency Gas Boiler - Boiler Water Pump – Double Rings detail pictures


Related Product Guide:
Boiler Structure

To fulfill the customers' over-expected fulfillment , we have now our solid staff to deliver our greatest general assistance which includes internet marketing, product sales, creating, manufacturing, excellent controlling, packing, warehousing and logistics for Newly Arrival High Efficiency Gas Boiler - Boiler Water Pump – Double Rings , The product will supply to all over the world, such as: moldova, Kazakhstan, Nepal, Each product is carefully made, it will make you satisfied. Our products in the production process have got strictly monitored, because it is only to provide you the best quality, we will feel confident. High production costs but low prices for our long-term cooperation. You can have a variety choices and the value of all types are same reliable. If you have any question, do not hesitate to ask us.
  • This is a honest and trustworthy company, technology and equipment are very advanced and the prodduct is very adequate, there is no worry in the suppliment.
    5 Stars By Maria from Armenia - 2018.06.28 19:27
    The supplier abide the theory of "quality the basic, trust the first and management the advanced" so that they can ensure a reliable product quality and stable customers.
    5 Stars By Jean from panama - 2017.02.18 15:54
    Write your message here and send it to us

    Related products

    • Massive Selection for Gas Boiler Hot Water - Coal Boiler Biomass Boiler Water Flim Dust Cleaner – Double Rings

      Massive Selection for Gas Boiler Hot Water - C...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

    • Bottom price Industrial Hot Water Boiler - SZS Gas Oil PLG Boiler – Double Rings

      Bottom price Industrial Hot Water Boiler - SZS...

      Introduction : SZS series boiler body is longitudinal 2-drum, D-type chamber combustion strueture. The furnace is on right side and the convection bank tube is on left side. The body is fixed on the body chassis by flexible supports in the middle and two ends of the lower drum,can secure to let the whole boiler body to expand sideways. Surround furnace there are narrow space membrane cooling tube wall. It is totally sealed and separated between the membrane wall on furnace left side and the c...

    • High Quality Electric Boiler - Boiler Electric Control – Double Rings

      High Quality Electric Boiler - Boiler Electric...

      More Photos Electric Control Container Overview 2-4T 6T 10T 15T 20T 25T Sheet 1: 2t steam boiler electrical instrument control system configuration (common configuration 1.25Mpa) Features name Specification unit Qty Brand Electrical control           Induced draft fan control 11KW  Star Delta Start  set  1  Zhengtai Blower control  3KW  Direct start  set  1  Grate control  0.55KW  Direct start  set  1  Coal machine control 1.1KW  Direct start  set  1  Slag machine control ...

    • New Arrival China Hot Water Boiler - Installation & Technology Service – Double Rings

      New Arrival China Hot Water Boiler - Installat...

      Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...

    • Popular Design for Water Boilers - Coal Boiler Economizer – Double Rings

      Popular Design for Water Boilers - Coal Boiler...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer P...

    • Top Quality Oil Central Heating - Gas oil Boiler Economizer – Double Rings

      Top Quality Oil Central Heating - Gas oil Boil...

      More photo Boiler economizers are heat exchange devices with finned tubes that heat a liquid, sometimes water, up to however sometimes doesn’t exceed the boiling purpose of liquid. We can manufacture three types of boiler economizer, bare tube economizer, H finned tube economizer and spiral finned tube economizer. H-finned tube economizer is high efficient heat exchanger economizer which is consisted of H-finned tubes.