Best quality Boiler Manufacturers - Single Drum Hot Water Boiler – Double Rings

Short Description:


Product Detail

Related Video

Feedback (2)

We have been committed to offering easy,time-saving and money-saving one-stop purchasing service of consumer for china oil boiler, horizontal thermal oil boiler, biomass boiler dust cleaner, Within our initiatives, we already have many shops in China and our solutions have won praise from prospects around the globe. Welcome new and outdated consumers to call us for that upcoming long term small business associations.
Best quality Boiler Manufacturers - Single Drum Hot Water Boiler – Double Rings Detail:

Parameter :

DZG(L)Bearing Pressure Hot water boiler

Main Technology Parameter List

Model DZG0.7-0.7/95/70
DZL0.7-0.7/95/70 
DZG1.4-0.7/95/70
DZL1.4-0.7/95/70
DZL1.4-1.0/115/70
DZL28-1.0/115/70
DZL2.8-1.25/130/70
DZL4.2-1.0/115/70
DZL4.2-1.25/130/70
Rated Capacity T/h 0.7 1.4 2.8 4.2
Rated Working Pressure Mpa 0.7 0.7/1.0 1.0/1.25 1.0/1.25
Rated Steam Temp. 95 95/115 115/130 115/130
Feed Water Temp. 70 70 70 70
Fuel Consumption  Kg/H ~150 ~310 ~590 ~900
Thermal Efficiency  % 75 78 79 77.44
Heating Surface Boiler Body  32.4 33.85 75.75 142
Economizer  24.64 38.5 87.2
Grate area   m² 1.4/2.05 2.3/3.5 4.66 7.4
Designed Fuel  Type Bituminous Coal Bituminous Coal Bituminous Coal Bituminous Coal
Max. Transport Weight  T ~16 ~21 ~26.5 ~30
Max. Transport Dimension  m 4.3×2.25×2.955.26×2.25×2.95 5.1×2.2×3.35.9×2.2×3.3 6.5×2.6×3.5 6.01×3.4×3.57.29×2.9×1.7
Boiler Auxiliary Equipment Model and Specification
Air Blower Model T4-72-11;3.2A Right T4-72-11;3.5A Right T4-72-11;4A Right T4-72-11;5A  Right
Motor Power N=1.5 Kw N=3 Kw N=5.5 Kw N=11 Kw
Draft Fan Model YX9-355C ; Right 0° Y-9-26;6.3C ; Right 0° Y-9-26;9D;Right 0° Y8-399D;Ring 0°
Motor Power N=5.5 Kw N=11 Kw N=22 Kw N=30 Kw
Gear Box Model GL-5P GL-5P GL-5P GL-10P
Motor Power N=0.55 Kw N=0.55 Kw N=0.55 Kw N=1.1Kw
Feed Water Pump Model 1.5WCT-120 1.5WCT-120 1½ GC5x5 2GC5x4
Motor Power N=2.2 Kw N=2.2Kw N=5.5 Kw N=11 Kw
Dust Remover Model XD-1 XD-2 XD-4 XD-6

 

ModelItem DZL7-1.0/115/70 DZL14-1.0/115/70 DZL29-1.25/130/70 DZL46-1.25/130/70 DZL58-1.25/130/70 DZL70-1.25/130/70
Rated Capacity T/h 7 14 29 46 58 70
Rated Working Pressure Mpa 1.0 1.0 1.25 1.25 1.25 1.25
Rated Steam Temp. 115 115 130 130 130 130
Feed Water Temp. 70 70 70 70 70 70
Heating AreaBoiler Body 228.6 434.7 Radiation:73.07Convection:903.01 Radiation:147.8Convection:1418.5 Radiation:147.8Convection:1418.5 Radiation:147.8Convection:1418.5
Grate area   m² 11.5 22.5 34.5 57.8 77 91
FuelKj/Kg Coal  Class II Bituminous Coal
Low heat 18757 17693
Fuel Consumption Kg/h ~1440 ~2700 ~6610 ~10500 ~12800 ~15300
Thermal Efficiency  % 80 80 82.5 82.05 83.03 83.28
Max. Transport Weight  Ton 35 28 19.68 28.796 31 31

Product detail pictures:

Best quality Boiler Manufacturers - Single Drum Hot Water Boiler – Double Rings detail pictures


Related Product Guide:
Boiler Structure

We often stay with the principle "Quality Very first, Prestige Supreme". We have been fully committed to supplying our consumers with competitively priced high-quality goods, prompt delivery and skilled provider for Best quality Boiler Manufacturers - Single Drum Hot Water Boiler – Double Rings , The product will supply to all over the world, such as: Jordan, Colombia, Sacramento, With the first-class products, excellent service, fast delivery and the best price, we have won highly praise foreign customers'. Our products have been exported to Africa, the Middle East, Southeast Asia and other regions.
  • Superb technology, perfect after-sales service and efficient work efficiency, we think this is our best choice.
    5 Stars By Modesty from Plymouth - 2018.03.03 13:09
    The product classification is very detailed that can be very accurate to meet our demand, a professional wholesaler.
    5 Stars By Gustave from Qatar - 2017.01.28 19:59
    Write your message here and send it to us

    Related products

    • Hot-selling Industrial Electric Boiler - Coal Boiler Economizer – Double Rings

      Hot-selling Industrial Electric Boiler - Coal ...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer P...

    • Good Wholesale Vendors Biomass Heating - Oil Steam Boiler – Double Rings

      Good Wholesale Vendors Biomass Heating - Oil S...

      Introduction : WNS series steam boiler burning oil or gas is Horizontal internal combustion three backhaul fire tube boiler, adopts boiler furnace wet back structure, high temperature smoke, gas turn to scour the second and third backhaul smoke tube plate, then after the smoke chamber. discharged into the atmosphere through the chimney. There are the front and back Smokebox Cap in the boiler, easy to maintenance. Excellent burner adopts combustion automatic ratio adjustment , feedwater ...

    • Cheap price China Industrial Boiler - LPG Pressure Tank – Double Rings

      Cheap price China Industrial Boiler - LPG Pres...

      Introduction: Pressure vessel equipment plays an important role in the petrochemical industry, the energy industry, scientific research and military sectors etc. Pressure vessel container body consist of cylinder, sealing head, flange, sealing elements, open pore and connected pipe, bearing. In addition, also equipped with safety devices, meter and safety internals for protection purpose . Pressure Vessel Main Performance Parameter List Steam Pressure1.0Mpa Inlet Temperature 250℃ S...

    • Reasonable price Boiler Power Plant - Boiler Ladder and Stair – Double Rings

      Reasonable price Boiler Power Plant - Boiler L...

      Quality Control 1 Strength Calculation Report for Applied Materials after Inspection Machine inspected. 2 100%NDT(non-destructive inspection) report of steel plate,tube and welding rod; 3 100% X-ray inspection report (welding seam):to ensure the quality of the entire boiler; 4 Hydraulic test report:ensure the standard working pressure and safety; 5 Third-party inspection report:by Special Equipment Safety Supervision Inspection Institute of Jiang Su Province 6 Manufacturer Produc...

    • Online Exporter Boiler Industry - Installation & Technology Service – Double Rings

      Online Exporter Boiler Industry - Installation...

      Installation Procedure Step 1. Slag Extruder put into Foundation| Step 2. Lift Boiler Body to Foundation . Then install the Platform and Stair. Step 3.Connect Boiler,Economizer (Down Part) and Gas Flue. Step 4. Connect Economizer ( Up Parts) and Gas Flue. Step 5.Use asbest rope to Fix Economizer and Gas Flue. Keep no gas leak. Step 6. Lift Dust Cleaner to Foundation. Step 7.Connect and fix the Gas Flue between Dust Cleaner and Economizer . Step 8. Lift I.D Fan to Foundation Step...

    • China OEM Boiler Accessory - Boiler Water Tank – Double Rings

      China OEM Boiler Accessory - Boiler Water Tank...

      Used in Boiler Tank accessories (1) Water inlet pipe: The water inlet pipe of the water tank is generally connected from the side wall, but it can also be connected from the bottom or top. When the water tank USES the pipe network pressure to fill the water, the inlet pipe outlet should be equipped with a floating ball valve or hydraulic valve. Generally, there are not less than 2 floating ball valves. The diameter of the ball float valve is the same as that of the inlet pipe, and each ...